JFK T8 Bus Stop

Scope of Work:
- Furnish & Install all required drywall partitions and framing per construction documents. This includes and
is not limited to gypsum walls, gypsum board ceilings, soffits/fascias, window pockets, stud, top and bottom track - Furnish & Install all required exterior framing and sheathing per construction documents
- Install all required hollow metal doors, frames and hardware per construction documents. Doors, Frames and Hardware to be provided by others.
- Furnish & Install all required corner guards per construction documents.
- Furnish & Install all required seismic bracing per construction documents
- Install all required Fire Extinguishers and Fire Extinguisher Cabinets per construction documents. Fire
- Extinguisher and Fire Extinguisher Cabinet is to be provided by others.
Location:
JFK Airport Terminal 8 Jamaica , NY, 11430
Size:
$680,000
Year:
2024
Architect:
Corgan Associate Architects
Types:
Industrial
Related Projects
25D0021 Barclays Center
Barclays Center RenovationsScope of Work: GFRG Columns, specialty ceilings, Cold form metal framing Location: Brooklyn, NY Year: 2025 General Contractor: Shawmut Gallagher Terrace and Modelo® Bridge at Barclays Center Architect: Populous Type: Commercial...
25D018 Port Authority
Barclays Center RenovationsScope of Work: Drywall and Ceiling Location: New York, NY Year: 2025 General Contractor: John O'Hara Architect: Foster + Partners and A. Epstein and Sons International, Inc. Types: Commercial InteriorRelated Projects
New York Presbyterian Hospital
Barclays Center RenovationsScope of Work: Curtis Partition’s scope of work includes the installation of structural and non-structural framing, drywall,and wall finishing to meet project specifications. The facility includes 33 exam rooms, six procedure rooms,...