JFK T8 Bus Stop

JFK T8 Bus Stop

Scope of Work:

  • Furnish & Install all required drywall partitions and framing per construction documents. This includes and
    is not limited to gypsum walls, gypsum board ceilings, soffits/fascias, window pockets, stud, top and bottom track
  • Furnish & Install all required exterior framing and sheathing per construction documents
  • Install all required hollow metal doors, frames and hardware per construction documents. Doors, Frames and Hardware to be provided by others.
  • Furnish & Install all required corner guards per construction documents.
  • Furnish & Install all required seismic bracing per construction documents
  • Install all required Fire Extinguishers and Fire Extinguisher Cabinets per construction documents. Fire
  • Extinguisher and Fire Extinguisher Cabinet is to be provided by others.

Location:

JFK Airport Terminal 8 Jamaica , NY, 11430

 

Size:

$680,000

Year:

2024

Architect:

Corgan Associate Architects

 

Types:

Industrial

Related Projects

Pure Liquid LL2370

Pure Liquid LL2370

Pure Liquid LL2370Scope of Work: Drywall, ceilings, hard ceilings fit-out, install of metal substrate for wood barrel ceilings, light pocket, install wood flooring, recessed lighting Location: 1 WTC - Space #LL2370 Size: Under $150,000 Year Completed: 2016 Architect:...

read more
New York Stock Exchange

New York Stock Exchange

New York Stock ExchangeScope of Work: Drywall, ceilings, OSHA protection, Decoustic fabric wrap mesh, acoustical plaster, decoustic ceilings, light cove, groin vault ceilings, beam wraps Location: 11 Wall Strett - 6th & 7th Floor Size: $1,000,000 - $5,000,000 Year...

read more
Wework

Wework

WeworkScope of Work: Drywall, ceilings, prefabrication of headers, sheetrock and window pockets Location: 12 East 49th Street Size: $1,000,000 - $5,000,000 Year Completed: 2016 Architect: Vocon Type: Commercial InteriorsSimilar Projects

read more
Skip to content