JFK T8 Bus Stop
Project Status:
Completed
Scope of Work:
- Furnish & Install all required drywall partitions and framing per construction documents. This includes and
is not limited to gypsum walls, gypsum board ceilings, soffits/fascias, window pockets, stud, top and bottom track - Furnish & Install all required exterior framing and sheathing per construction documents
- Install all required hollow metal doors, frames and hardware per construction documents. Doors, Frames and Hardware to be provided by others.
- Furnish & Install all required corner guards per construction documents.
- Furnish & Install all required seismic bracing per construction documents
- Install all required Fire Extinguishers and Fire Extinguisher Cabinets per construction documents. Fire
- Extinguisher and Fire Extinguisher Cabinet is to be provided by others.
Location:
JFK Airport Terminal 8 Jamaica , NY, 11430
Size:
$680,000
Year:
2024
Architect:
Corgan Associate Architects
Types:
Industrial
Related Projects
Li & Fung
Li & FungScope of Work: Drywall, acoustical ceilings, prefab colun capitals, and prefab light coves (there were almost no right angle on the project Location: 350 5th Ave. Size: $1,000,000 - $5,000,000 Year Completed: 2013 Architect: SpaceSmith Type: Commercial...
Citigroup
CitigroupScope of Work: Drywall, acoustical ceilings, curved soffits, axiom trim Location: 25-01 Jackson Avenue - 6th, 21st and 25th floors Size: $500,000 - $1,000,000 Year Completed: 2013 Architect: Gensler Type: Commercial Interior, FeaturedSimilar Projects
Sumitomo
SumitomoScope of Work: Drywall, acoustical ceilings, Decoustics ceilings, prefab window pockets and light covers, dome light cove ceiling at lobby Location: 300 Madison Ave. - 3rd and 4th floor Size: $1,000,000 - $5,000,000 Year Completed: 2013 Architect: Gensler...