Scope of Work:

  • Furnish & Install all required drywall partitions and framing per construction documents. This includes and
    is not limited to gypsum walls, gypsum board ceilings, soffits/fascias, window pockets, stud, top and bottom track
  • Furnish & Install all required exterior framing and sheathing per construction documents
  • Install all required hollow metal doors, frames and hardware per construction documents. Doors, Frames and Hardware to be provided by others.
  • Furnish & Install all required corner guards per construction documents.
  • Furnish & Install all required seismic bracing per construction documents
  • Install all required Fire Extinguishers and Fire Extinguisher Cabinets per construction documents. Fire
  • Extinguisher and Fire Extinguisher Cabinet is to be provided by others.

Location:

JFK Airport Terminal 8 Jamaica , NY, 11430

Size:

$680,000

Year:

2024

Architect:

Corgan Associate Architects

Types:

Industrial

Related Projects

Li & Fung

Li & Fung

Li & FungScope of Work: Drywall, acoustical ceilings, prefab colun capitals, and prefab light coves (there were almost no right angle on the project Location: 350 5th Ave. Size: $1,000,000 - $5,000,000 Year Completed: 2013 Architect: SpaceSmith Type: Commercial...

read more
Citigroup

Citigroup

CitigroupScope of Work: Drywall, acoustical ceilings, curved soffits, axiom trim Location: 25-01 Jackson Avenue - 6th, 21st and 25th floors Size: $500,000 - $1,000,000 Year Completed: 2013 Architect: Gensler Type: Commercial Interior, FeaturedSimilar Projects

read more
Sumitomo

Sumitomo

SumitomoScope of Work: Drywall, acoustical ceilings, Decoustics ceilings,  prefab window pockets and light covers, dome light cove ceiling at lobby Location: 300 Madison Ave. - 3rd and 4th floor Size: $1,000,000 - $5,000,000 Year Completed: 2013 Architect: Gensler...

read more