JFK T8 Bus Stop
Project Status:
Completed
Scope of Work:
- Furnish & Install all required drywall partitions and framing per construction documents. This includes and
is not limited to gypsum walls, gypsum board ceilings, soffits/fascias, window pockets, stud, top and bottom track - Furnish & Install all required exterior framing and sheathing per construction documents
- Install all required hollow metal doors, frames and hardware per construction documents. Doors, Frames and Hardware to be provided by others.
- Furnish & Install all required corner guards per construction documents.
- Furnish & Install all required seismic bracing per construction documents
- Install all required Fire Extinguishers and Fire Extinguisher Cabinets per construction documents. Fire
- Extinguisher and Fire Extinguisher Cabinet is to be provided by others.
Location:
JFK Airport Terminal 8 Jamaica , NY, 11430
Size:
$680,000
Year:
2024
Architect:
Corgan Associate Architects
Types:
Industrial
Related Projects
PS 314
PS 314Scope of Work: Drywall, ceilings, walls, hollow metal frames and hardware Location: 88-08 164th Street Size: $1,000,000 - $5,000,000 Year Completed: 2013 Architect: E. Bruce Barrett R.A. Type: EducationSimilar Projects
Harlem Dream
Harlem DreamScope of Work: Drywall, ceilings, hollow metal frames and hardware, exterior metal panel ceilings, interior custom metal panel ceilings, Armstrong wood panel ceilings, soffit and fascia. Location: 1991 2nd Ave. Size: $1,000,000 – $5,000,000 Year Completed:...
About.com
About.comScope of Work: Drywall, acoustical ceilings, and Rope Ceiling fire rated red rope ceiling built on a unistrut frame Location: 1500 Broadway - 5,6th floor Size: $500,000 - $1,000,000 Year Completed: 2012 Architect: Gensler Type: Commercial Interior,...