JFK T8 Bus Stop
Project Status:
Completed
Scope of Work:
- Furnish & Install all required drywall partitions and framing per construction documents. This includes and
is not limited to gypsum walls, gypsum board ceilings, soffits/fascias, window pockets, stud, top and bottom track - Furnish & Install all required exterior framing and sheathing per construction documents
- Install all required hollow metal doors, frames and hardware per construction documents. Doors, Frames and Hardware to be provided by others.
- Furnish & Install all required corner guards per construction documents.
- Furnish & Install all required seismic bracing per construction documents
- Install all required Fire Extinguishers and Fire Extinguisher Cabinets per construction documents. Fire
- Extinguisher and Fire Extinguisher Cabinet is to be provided by others.
Location:
JFK Airport Terminal 8 Jamaica , NY, 11430
Size:
$680,000
Year:
2024
Architect:
Corgan Associate Architects
Types:
Industrial
Related Projects
Google Lobby
Google LobbyScope of Work: Drywall, metal ceilings Location: 111 8th Ave. Size: $150,000 - $500,000 Year Completed: 2012 Architect: HLW International LLP Type: Commercial InteriorsSimilar Projects
Axis
AxisScope of Work: Drywall, acoustical ceilings office fit out with Decoustics Location: 1211 Ave of the Americas - 26th Size: $500,000 - $1,000,000 Year Completed: 2012 Architect: TPG Type: Commercial InteriorsSimilar Projects
Church Pension Group
Church Pension GroupScope of Work: Drywall, acoustical ceilings, Armstrong cloud ceiling system, and Groin vault and coffered Star Silent plaster ceiling Location: 16 E 35th Street, 1, 3-7th floor Size: Over $5,000,000 Year Completed: 2012 Architect: Beyer Blinder...