JFK T8 Bus Stop

Project Status:

Completed

Scope of Work:

  • Furnish & Install all required drywall partitions and framing per construction documents. This includes and
    is not limited to gypsum walls, gypsum board ceilings, soffits/fascias, window pockets, stud, top and bottom track
  • Furnish & Install all required exterior framing and sheathing per construction documents
  • Install all required hollow metal doors, frames and hardware per construction documents. Doors, Frames and Hardware to be provided by others.
  • Furnish & Install all required corner guards per construction documents.
  • Furnish & Install all required seismic bracing per construction documents
  • Install all required Fire Extinguishers and Fire Extinguisher Cabinets per construction documents. Fire
  • Extinguisher and Fire Extinguisher Cabinet is to be provided by others.

Location:

JFK Airport Terminal 8 Jamaica , NY, 11430

Size:

$680,000

Year:

2024

Architect:

Corgan Associate Architects

Types:

Industrial

Related Projects

Google Lobby

Google Lobby

Google LobbyScope of Work: Drywall, metal ceilings Location: 111 8th Ave. Size: $150,000 - $500,000 Year Completed: 2012 Architect: HLW International LLP Type: Commercial InteriorsSimilar Projects

read more
Axis

Axis

AxisScope of Work: Drywall, acoustical ceilings office fit out with Decoustics Location: 1211 Ave of the Americas - 26th Size: $500,000 - $1,000,000 Year Completed: 2012 Architect: TPG Type: Commercial InteriorsSimilar Projects

read more
Church Pension Group

Church Pension Group

Church Pension GroupScope of Work: Drywall, acoustical ceilings, Armstrong cloud ceiling system, and Groin vault and coffered Star Silent plaster ceiling Location: 16 E 35th Street, 1, 3-7th floor Size: Over $5,000,000 Year Completed: 2012 Architect: Beyer Blinder...

read more