JFK T8 Bus Stop
Project Status:
Completed
Scope of Work:
- Furnish & Install all required drywall partitions and framing per construction documents. This includes and
is not limited to gypsum walls, gypsum board ceilings, soffits/fascias, window pockets, stud, top and bottom track - Furnish & Install all required exterior framing and sheathing per construction documents
- Install all required hollow metal doors, frames and hardware per construction documents. Doors, Frames and Hardware to be provided by others.
- Furnish & Install all required corner guards per construction documents.
- Furnish & Install all required seismic bracing per construction documents
- Install all required Fire Extinguishers and Fire Extinguisher Cabinets per construction documents. Fire
- Extinguisher and Fire Extinguisher Cabinet is to be provided by others.
Location:
JFK Airport Terminal 8 Jamaica , NY, 11430
Size:
$680,000
Year:
2024
Architect:
Corgan Associate Architects
Types:
Industrial
Related Projects
CUNY School of Law
CUNY School of LawScope of Work: Drywall, Acoustical Ceilings and Curved Decoustic ceilings Location: 2 Court Square 1 - 6th Floor Size: $500,000 - $1,000,000 Year Completed: 2011 Type: EducationSimilar Projects
Javits
JavitsScope of Work: Drywall, Ceilings, light guage metal framing, high end-paster finishing with reveal bed, OSHA protection, demolition, bathroom finishes, Carritec ceilings, Lindner ceilings, and Decoustics ceiling, Architectural prime services Location: 655 West...
Harlem Hospital
Harlem HospitalScope of Work: Drywall, acoustical ceilings, OSHA protection, 8 story atrium high-end finishes, with reveal bead, light gauge metal framing and sheathing, and modular art mill work panels, wood trim Location: 506 Lenox Ave Size: Over $5,000,000 Year...