JFK T8 Bus Stop

JFK T8 Bus Stop

Scope of Work:

  • Furnish & Install all required drywall partitions and framing per construction documents. This includes and
    is not limited to gypsum walls, gypsum board ceilings, soffits/fascias, window pockets, stud, top and bottom track
  • Furnish & Install all required exterior framing and sheathing per construction documents
  • Install all required hollow metal doors, frames and hardware per construction documents. Doors, Frames and Hardware to be provided by others.
  • Furnish & Install all required corner guards per construction documents.
  • Furnish & Install all required seismic bracing per construction documents
  • Install all required Fire Extinguishers and Fire Extinguisher Cabinets per construction documents. Fire
  • Extinguisher and Fire Extinguisher Cabinet is to be provided by others.

Location:

JFK Airport Terminal 8 Jamaica , NY, 11430

 

Size:

$680,000

Year:

2024

Architect:

Corgan Associate Architects

 

Types:

Industrial

Related Projects

Brooklyn Museum

Brooklyn Museum

Brooklyn MuseumScope of Work: Drywall, Ecophon ceilings, New Mat Ceilings, Fellert Plaster ceilings, install door frames,  pre-fab soffits / headers Location: 200 Eastern Parkway Size: $500,000 - $1,000,000 Year Completed: 2011 Architect: Ennead Architects LLP Type:...

read more
CUNY School of Law

CUNY School of Law

CUNY School of LawScope of Work: Drywall, Acoustical Ceilings and Curved Decoustic ceilings Location: 2 Court Square 1 - 6th Floor Size: $500,000 - $1,000,000 Year Completed: 2011 Type: EducationSimilar Projects

read more
Javits

Javits

JavitsScope of Work: Drywall, Ceilings, light guage metal framing, high end-paster finishing with reveal bed, OSHA protection, demolition, bathroom finishes, Carritec ceilings, Lindner ceilings, and Decoustics ceiling, Architectural prime services Location: 655 West...

read more
Skip to content