JFK T8 Bus Stop

Scope of Work:
- Furnish & Install all required drywall partitions and framing per construction documents. This includes and
is not limited to gypsum walls, gypsum board ceilings, soffits/fascias, window pockets, stud, top and bottom track - Furnish & Install all required exterior framing and sheathing per construction documents
- Install all required hollow metal doors, frames and hardware per construction documents. Doors, Frames and Hardware to be provided by others.
- Furnish & Install all required corner guards per construction documents.
- Furnish & Install all required seismic bracing per construction documents
- Install all required Fire Extinguishers and Fire Extinguisher Cabinets per construction documents. Fire
- Extinguisher and Fire Extinguisher Cabinet is to be provided by others.
Location:
JFK Airport Terminal 8 Jamaica , NY, 11430
Size:
$680,000
Year:
2024
Architect:
Corgan Associate Architects
Types:
Industrial
Related Projects
PS 229
PS 229Scope of Work: Drywall, acoustical ceilings, light covers, fiber-reinforced panels, wood covered panels, and metal ceilings Location: 1400 Benson Ave. Size: $1,000,000 - $5,000,000 Year Completed: 2008 Architect: Medhat Halam Associates Type: EducationSimilar...
Brooklyn College
Brooklyn CollegeScope of Work: Drywall, acoustical ceilings, light coves Location: 2900 Bedford Ave. Size: $1,000,000 - $5,000,000 Year Completed: 2007 Type: EducationSimilar Projects
Memorial Sloan Kettering – M2
Memorial Sloan Kettering - M2Scope of Work: Drywall, acoustical ceilings, Decoustics ceilings, lead line drywall, and Construction Specialties Acrovyn wall protection Location: 1275 York Ave - 2nd floor Size: $500,000 - $1,000,000 Year Completed: 2007 Type:...



