JFK T8 Bus Stop

Project Status:

Completed

Scope of Work:

  • Furnish & Install all required drywall partitions and framing per construction documents. This includes and
    is not limited to gypsum walls, gypsum board ceilings, soffits/fascias, window pockets, stud, top and bottom track
  • Furnish & Install all required exterior framing and sheathing per construction documents
  • Install all required hollow metal doors, frames and hardware per construction documents. Doors, Frames and Hardware to be provided by others.
  • Furnish & Install all required corner guards per construction documents.
  • Furnish & Install all required seismic bracing per construction documents
  • Install all required Fire Extinguishers and Fire Extinguisher Cabinets per construction documents. Fire
  • Extinguisher and Fire Extinguisher Cabinet is to be provided by others.

Location:

JFK Airport Terminal 8 Jamaica , NY, 11430

Size:

$680,000

Year:

2024

Architect:

Corgan Associate Architects

Types:

Industrial

Related Projects

NYU

NYU

NYUScope of Work: Wall Non Load-Bearing Metal Framing, Door Framing, Shaft Wall, Gypsum Drywall Sheathing, Interior Ceilings and Soffits, Acoustical Ceilings, Drywall Finishing, Interior Partitions, Specialty Acoustical Panels, Specialty Ceilings with Metal Supports,...

read more
InTandem

InTandem

InTandemScope of Work: Specialty Ceilings, Drywall Framing, Walls, Total Door Installation, Gypsum Drywall Sheathing, Plastering Walls and Ceilings, Aluminum Closures, Shade Pockets Location: 10 Vanderbilt Avenue, 17th floor, NYC, NY Size: $100,000 - $600,000 Year...

read more
CHS DNA

CHS DNA

CHS DNAScope of Work: Specialty Ceilings, Acoustical Ceilings, Drywall Framing, Drywall Sheathing, Plastering Walls, Installation of Doors. Location: 300 Jay Street, Brooklyn, N.Y. Size: 1,000,000 – 2,000,000 Year Completed: 2021 Architect: Centerbrook Architects and...

read more