JFK T8 Bus Stop
Project Status:
Completed
Scope of Work:
- Furnish & Install all required drywall partitions and framing per construction documents. This includes and
is not limited to gypsum walls, gypsum board ceilings, soffits/fascias, window pockets, stud, top and bottom track - Furnish & Install all required exterior framing and sheathing per construction documents
- Install all required hollow metal doors, frames and hardware per construction documents. Doors, Frames and Hardware to be provided by others.
- Furnish & Install all required corner guards per construction documents.
- Furnish & Install all required seismic bracing per construction documents
- Install all required Fire Extinguishers and Fire Extinguisher Cabinets per construction documents. Fire
- Extinguisher and Fire Extinguisher Cabinet is to be provided by others.
Location:
JFK Airport Terminal 8 Jamaica , NY, 11430
Size:
$680,000
Year:
2024
Architect:
Corgan Associate Architects
Types:
Industrial
Related Projects
NYU
NYUScope of Work: Wall Non Load-Bearing Metal Framing, Door Framing, Shaft Wall, Gypsum Drywall Sheathing, Interior Ceilings and Soffits, Acoustical Ceilings, Drywall Finishing, Interior Partitions, Specialty Acoustical Panels, Specialty Ceilings with Metal Supports,...
InTandem
InTandemScope of Work: Specialty Ceilings, Drywall Framing, Walls, Total Door Installation, Gypsum Drywall Sheathing, Plastering Walls and Ceilings, Aluminum Closures, Shade Pockets Location: 10 Vanderbilt Avenue, 17th floor, NYC, NY Size: $100,000 - $600,000 Year...
CHS DNA
CHS DNAScope of Work: Specialty Ceilings, Acoustical Ceilings, Drywall Framing, Drywall Sheathing, Plastering Walls, Installation of Doors. Location: 300 Jay Street, Brooklyn, N.Y. Size: 1,000,000 – 2,000,000 Year Completed: 2021 Architect: Centerbrook Architects and...