JFK T8 Bus Stop

Project Status:

Completed

Scope of Work:

  • Furnish & Install all required drywall partitions and framing per construction documents. This includes and
    is not limited to gypsum walls, gypsum board ceilings, soffits/fascias, window pockets, stud, top and bottom track
  • Furnish & Install all required exterior framing and sheathing per construction documents
  • Install all required hollow metal doors, frames and hardware per construction documents. Doors, Frames and Hardware to be provided by others.
  • Furnish & Install all required corner guards per construction documents.
  • Furnish & Install all required seismic bracing per construction documents
  • Install all required Fire Extinguishers and Fire Extinguisher Cabinets per construction documents. Fire
  • Extinguisher and Fire Extinguisher Cabinet is to be provided by others.

Location:

JFK Airport Terminal 8 Jamaica , NY, 11430

Size:

$680,000

Year:

2024

Architect:

Corgan Associate Architects

Types:

Industrial

Related Projects

One Wall Street

One Wall Street

One Wall StreetScope of Work: Plastering of walls and ceilings, Shaftwalls, Soffits, Sheetrock ceilings with 1" specific pattern, 2 hour Rated Partitions, No Acoustical Ceiling Tiles, Elevator Fronts, Aligning Metal Beads, Mailbox Cavities, Installation of Hollow...

read more
Google GSA

Google GSA

Google GSAScope of Work: Metal Framing and Sheathing, Insulation, Windows and hardware installation, Metal support assemblies, Wall Framing, Gypsum Drywall Interior Walls, Ceilings and Soffits, Acoustical ceilings, Drywall Finishing Location: 111 8th Ave. 2nf Floor,...

read more
American Airlines

American Airlines

American AirlinesScope of Work: Wall Framing, ACT ceiling tile, Wooden Blocking, Drywall Finishing Location: JFK, Terminal 8, Jamaica, NY Size: $1,000,000 - $2,000,000 Year Completed: 2018 Architect: Mancini Duffy Type: Commercial InteriorsSimilar Projects

read more