New York Presbyterian Hospital

Barclays Center Renovations

20250302 - Curtis-45

Scope of Work:

Curtis Partition’s scope of work includes the installation of structural and non-structural framing, drywall,
and wall finishing to meet project specifications.

The facility includes 33 exam rooms, six procedure rooms, radiology suites with two MRI machines, two
CT scanners, two X-ray machines, and an EOS machine, a medical imaging system that takes low-dose Xray images of a patient’s body in a standing position to create 2D and 3D images of the skeletal system,
and a 2,000-square-foot rehabilitation gym staffed by physical therapists who specialize in spine care.

 

Location:

New Yourk, NY

Year:

2024

General Contractor:

Turner Construction

Architect:

Pei Cobb Freed & Partners

Types:

Commercial Interior

Related Projects

Javits

Javits

JavitsScope of Work: Drywall, Ceilings, light guage metal framing, high end-paster finishing with reveal bed, OSHA protection, demolition, bathroom finishes, Carritec ceilings, Lindner ceilings, and Decoustics ceiling, Architectural prime services Location: 655 West...

read more
Harlem Hospital

Harlem Hospital

Harlem HospitalScope of Work: Drywall, acoustical ceilings, OSHA protection, 8 story atrium high-end finishes, with reveal bead, light gauge metal framing and sheathing, and modular art mill work panels, wood trim Location: 506 Lenox Ave Size: Over $5,000,000 Year...

read more
Freedom Tower

Freedom Tower

Freedom TowerScope of Work: Drywall, acoustical ceilings, below grade core & shell drywall and OSHA protection package Location: 1 World Trade Center Size: $1,000,000 - $5,000,000 Year Completed: 2009 Architect: SOM Type: Featured, Core and ShellSimilar Projects

read more
Skip to content