Barclays Center Renovations

Scope of Work:
Curtis Partition’s scope of work includes the installation of structural and non-structural framing, drywall,
and wall finishing to meet project specifications.
The facility includes 33 exam rooms, six procedure rooms, radiology suites with two MRI machines, two
CT scanners, two X-ray machines, and an EOS machine, a medical imaging system that takes low-dose Xray images of a patient’s body in a standing position to create 2D and 3D images of the skeletal system,
and a 2,000-square-foot rehabilitation gym staffed by physical therapists who specialize in spine care.
Location:
New Yourk, NY
Year:
2024
General Contractor:
Turner Construction
Architect:
Pei Cobb Freed & Partners
Types:
Commercial Interior
Related Projects
CHS DNA
CHS DNAScope of Work: Specialty Ceilings, Acoustical Ceilings, Drywall Framing, Drywall Sheathing, Plastering Walls, Installation of Doors. Location: 300 Jay Street, Brooklyn, N.Y. Size: 1,000,000 – 2,000,000 Year Completed: 2021 Architect: Centerbrook Architects and...
Cozen O’Connor
Cozen O'ConnorScope of Work: Metal framing and sheathing, installation of doors, windows and hardware, Wall Framing, Gypsum Drywall Installation and Finishing, Richter Acoustical Panels Light Cove Location: 3 World Trade Center, 55th and 56th floors, New York City, NY...
American Kennel Club
American Kennel ClubScope of Work: Drywall, ceiling's framing and installation, soffits, install door frames and hardware, OSHA protection, GRG light cove, wall protection, FRP panels, tiles, light gauge mental framing, prefabrication of headers and sheetrock with...



