Columbia Business School

Scope of Work:
Curtis Partition proudly delivered interior systems for the Studio Museum in Harlem, a cultural landmark reimagined with bold architectural features, technical precision, and specialized finishes throughout. This ambitious museum build was defined by its deck-to-deck challenges, humidity control solutions, and an elevated design vision brought to life by our trade coordination, planning, and execution.
Our scope included:
Metal stud framing, insulation, and gypsum board systems
Shaftwall and fire-rated assemblies for accelerated scheduling
Custom stair framing and substrate prep for stone
Star Silent and Ecophon acoustical ceilings
Custom barrel ceiling framing using wiggle board
X-grid ceiling pop-ups and curved details
Exterior ceiling framing with engineered wind load resistance
Blocking and finish prep for 110-foot vertical gallery walls
Full Level 5 finish across gallery and public-facing spaces
Project Highlights
Environmental Control: Installed foil-backed sheetrock to regulate interior humidity and support climate control for artwork preservation.
Logistics & Layout: Navigated complex deck height changes and exposed floor drops across multiple levels with careful planning and safety protocol.
Specialty Assemblies: Partnered with Cooper Plaster to install Star Silent plenum ceilings with compound curves and Level 5 plaster finish.
Collaborative Build: Managed subcontract scopes for carpentry and acoustical systems with Creative and Cooper Plaster, respectively.
Architectural Finishes: Executed complex geometries, including curved ceilings, x-grid pop-ups, and custom access panel integrations.
Results
The Studio Museum in Harlem stands as a testament to architectural excellence and cultural legacy — and Curtis Partition’s ability to bring both to life through construction. Working alongside Sciame Construction and world-renowned design teams, we helped shape a landmark interior that’s both visually striking and technically sound — on time and to spec.
Location:
New York, NY
Size:
$11,650.000
Year:
2025
General Contractor:
Sciame Construction LLC
Architects:
Adjaye Associates and Cooper Robertson
Type:
Museum
Related Projects
Hudson Yards
Elevating Workspaces at Vista: Hudson YardsProject Overview: Company Name: Curtis Partition Project Name: Vista Project Status: Completed Scope of Work: Interior fit-out of two office floors (76th and 77th). Project Location: 50 Hudson Yards; Floors 76 & 77, New...
Eblock
EblockScope of Work: Build walls, ceilings, GFRG columns, Install Trespa, Corian Partitions, and Floor Grilles at Head House. Location: Head House at JFK Terminal 4, Jamaica, NY, 11430 Size: $5,000,000 - $7,000,000 Year: 2023 Architect: Gensler Types: Commercial...
Columbia Business School
Columbia Business SchoolScope of Work: Furnish and install GRG Panels, Columns and Framing Furnish and install Acoustcal Wood Ceilings and Supports Furnish and install Custom Metal Ceilings and Supports Furnish and install Soffit Framing and Sheetrock Location: 614...



