Studio Museum in Harlem

Columbia Business School

The Studio Museum in Harlem x Curtis Partition-2

Scope of Work:

Curtis Partition proudly delivered interior systems for the Studio Museum in Harlem, a cultural landmark reimagined with bold architectural features, technical precision, and specialized finishes throughout. This ambitious museum build was defined by its deck-to-deck challenges, humidity control solutions, and an elevated design vision brought to life by our trade coordination, planning, and execution.

Our scope included:

Metal stud framing, insulation, and gypsum board systems

Shaftwall and fire-rated assemblies for accelerated scheduling

Custom stair framing and substrate prep for stone

Star Silent and Ecophon acoustical ceilings

Custom barrel ceiling framing using wiggle board

X-grid ceiling pop-ups and curved details

Exterior ceiling framing with engineered wind load resistance

Blocking and finish prep for 110-foot vertical gallery walls

Full Level 5 finish across gallery and public-facing spaces

Project Highlights
Environmental Control: Installed foil-backed sheetrock to regulate interior humidity and support climate control for artwork preservation.

Logistics & Layout: Navigated complex deck height changes and exposed floor drops across multiple levels with careful planning and safety protocol.

Specialty Assemblies: Partnered with Cooper Plaster to install Star Silent plenum ceilings with compound curves and Level 5 plaster finish.

Collaborative Build: Managed subcontract scopes for carpentry and acoustical systems with Creative and Cooper Plaster, respectively.

Architectural Finishes: Executed complex geometries, including curved ceilings, x-grid pop-ups, and custom access panel integrations.

Results
The Studio Museum in Harlem stands as a testament to architectural excellence and cultural legacy — and Curtis Partition’s ability to bring both to life through construction. Working alongside Sciame Construction and world-renowned design teams, we helped shape a landmark interior that’s both visually striking and technically sound — on time and to spec.

Location:

New York, NY

Size:

$11,650.000

Year:

2025

General Contractor:

Sciame Construction LLC

Architects:

Adjaye Associates and Cooper Robertson

Type:

Museum

Related Projects

The Ark

The Ark

The ArkScope of Work: Drywall, ceilings & soffits, ACT ceilings, cement board ceilings, light guage metal framing, install animal cages Location: JFK Airport Building 78 Size: $1,000,000 - $5,000,000 Year Completed: 2016 Architect: Gensler Type:...

read more
Victoria Secret Flagship Store

Victoria Secret Flagship Store

Victoria Secret Flagship StoreScope of Work: Drywall, ceilings, soffits, install door frames and hardware, OSHA protection, GRG light cove, wall protection, FRP panels, light gauge metal framing, prefabrication of headers and sheetrock with plywood Location: 640 5th...

read more
Tous LL2353

Tous LL2353

Tous LL2353Scope of Work: Drywall, ceilings, hard ceilings fit-out, install of owners furniture, light cove, light pocket, install of owner's purchase cash wraps, recessed lighting, install glass retail cases Location: 1 WTC - Space # LL2353 Size: $150,000 - $500,000...

read more
Skip to content