Trevor Day
Scope of Work:
Drywall, ceilings, acoustical wall panel, GFRG columns covers, furnish and install marker boards, acoustical wall panels in gymnasium and music rooms, prefab beam enclosure and shade pockets
Location:
312 – 318 East 95th Street
Size:
$1,000,000 – $5,000,000
Year Completed:
2012
Architect:
Landscape Architects
Type:
Education
Similar Projects
Levin Management
Levin ManagementScope of Work: Metal Framing and Sheathing, Installation of Doors, Windows and Hardware, Wall Framing, Shaft Walls, Gypsum Drywall Installation and Finishing, Acoustical Ceilings Location: 1501 Broadway Size: $1,000,000 - $2,000,000 Year: 2018...
One Wall Street
One Wall StreetScope of Work: Plastering of walls and ceilings, Shaftwalls, Soffits, Sheetrock ceilings with 1" specific pattern, 2 hour Rated Partitions, No Acoustical Ceiling Tiles, Elevator Fronts, Aligning Metal Beads, Mailbox Cavities, Installation of Hollow...
Google GSA
Google GSAScope of Work: Metal Framing and Sheathing, Insulation, Windows and hardware installation, Metal support assemblies, Wall Framing, Gypsum Drywall Interior Walls, Ceilings and Soffits, Acoustical ceilings, Drywall Finishing Location: 111 8th Ave. 2nf Floor,...