JFK T8 Bus Stop

Project Status:

Completed

Scope of Work:

  • Furnish & Install all required drywall partitions and framing per construction documents. This includes and
    is not limited to gypsum walls, gypsum board ceilings, soffits/fascias, window pockets, stud, top and bottom track
  • Furnish & Install all required exterior framing and sheathing per construction documents
  • Install all required hollow metal doors, frames and hardware per construction documents. Doors, Frames and Hardware to be provided by others.
  • Furnish & Install all required corner guards per construction documents.
  • Furnish & Install all required seismic bracing per construction documents
  • Install all required Fire Extinguishers and Fire Extinguisher Cabinets per construction documents. Fire
  • Extinguisher and Fire Extinguisher Cabinet is to be provided by others.

Location:

JFK Airport Terminal 8 Jamaica , NY, 11430

Size:

$680,000

Year:

2024

Architect:

Corgan Associate Architects

Types:

Industrial

Related Projects

Cozen O’Connor

Cozen O’Connor

Cozen O'ConnorScope of Work: Metal framing and sheathing, installation of doors, windows and hardware, Wall Framing, Gypsum Drywall Installation and Finishing, Richter Acoustical Panels Light Cove Location: 3 World Trade Center, 55th and 56th floors, New York City, NY...

read more
American Kennel Club

American Kennel Club

American Kennel ClubScope of Work: Drywall, ceiling's framing and installation, soffits, install door frames and hardware, OSHA protection, GRG light cove, wall protection, FRP panels, tiles, light gauge mental framing, prefabrication of headers and sheetrock with...

read more
Levin Management

Levin Management

Levin ManagementScope of Work: Metal Framing and Sheathing, Installation of Doors, Windows and Hardware, Wall Framing, Shaft Walls, Gypsum Drywall Installation and Finishing, Acoustical Ceilings Location: 1501 Broadway Size: $1,000,000 - $2,000,000 Year: 2018...

read more