JFK T8 Bus Stop
Project Status:
Completed
Scope of Work:
- Furnish & Install all required drywall partitions and framing per construction documents. This includes and
is not limited to gypsum walls, gypsum board ceilings, soffits/fascias, window pockets, stud, top and bottom track - Furnish & Install all required exterior framing and sheathing per construction documents
- Install all required hollow metal doors, frames and hardware per construction documents. Doors, Frames and Hardware to be provided by others.
- Furnish & Install all required corner guards per construction documents.
- Furnish & Install all required seismic bracing per construction documents
- Install all required Fire Extinguishers and Fire Extinguisher Cabinets per construction documents. Fire
- Extinguisher and Fire Extinguisher Cabinet is to be provided by others.
Location:
JFK Airport Terminal 8 Jamaica , NY, 11430
Size:
$680,000
Year:
2024
Architect:
Corgan Associate Architects
Types:
Industrial
Related Projects
Allen Edmonds
Allen EdmondsScope of Work: Wooden Walls and Ceilings, Metal Wall framing, Soffits, Drywall Finishing Location: 30 Rockefeller Center, New York, NY Size: $90,000 - $100,000 Year Completed: 2017 Type: RetailSimilar Projects
The Ark
The ArkScope of Work: Drywall, ceilings & soffits, ACT ceilings, cement board ceilings, light guage metal framing, install animal cages Location: JFK Airport Building 78 Size: $1,000,000 - $5,000,000 Year Completed: 2016 Architect: Gensler Type:...
Victoria Secret Flagship Store
Victoria Secret Flagship StoreScope of Work: Drywall, ceilings, soffits, install door frames and hardware, OSHA protection, GRG light cove, wall protection, FRP panels, light gauge metal framing, prefabrication of headers and sheetrock with plywood Location: 640 5th...