Columbia Business School

Scope of Work:
Curtis Partition proudly delivered interior systems for the Studio Museum in Harlem, a cultural landmark reimagined with bold architectural features, technical precision, and specialized finishes throughout. This ambitious museum build was defined by its deck-to-deck challenges, humidity control solutions, and an elevated design vision brought to life by our trade coordination, planning, and execution.
Our scope included:
Metal stud framing, insulation, and gypsum board systems
Shaftwall and fire-rated assemblies for accelerated scheduling
Custom stair framing and substrate prep for stone
Star Silent and Ecophon acoustical ceilings
Custom barrel ceiling framing using wiggle board
X-grid ceiling pop-ups and curved details
Exterior ceiling framing with engineered wind load resistance
Blocking and finish prep for 110-foot vertical gallery walls
Full Level 5 finish across gallery and public-facing spaces
Project Highlights
Environmental Control: Installed foil-backed sheetrock to regulate interior humidity and support climate control for artwork preservation.
Logistics & Layout: Navigated complex deck height changes and exposed floor drops across multiple levels with careful planning and safety protocol.
Specialty Assemblies: Partnered with Cooper Plaster to install Star Silent plenum ceilings with compound curves and Level 5 plaster finish.
Collaborative Build: Managed subcontract scopes for carpentry and acoustical systems with Creative and Cooper Plaster, respectively.
Architectural Finishes: Executed complex geometries, including curved ceilings, x-grid pop-ups, and custom access panel integrations.
Results
The Studio Museum in Harlem stands as a testament to architectural excellence and cultural legacy — and Curtis Partition’s ability to bring both to life through construction. Working alongside Sciame Construction and world-renowned design teams, we helped shape a landmark interior that’s both visually striking and technically sound — on time and to spec.
Location:
New York, NY
Size:
$11,650.000
Year:
2025
General Contractor:
Sciame Construction LLC
Architects:
Adjaye Associates and Cooper Robertson
Type:
Museum
Related Projects
American Kennel Club
American Kennel ClubScope of Work: Drywall, ceiling's framing and installation, soffits, install door frames and hardware, OSHA protection, GRG light cove, wall protection, FRP panels, tiles, light gauge mental framing, prefabrication of headers and sheetrock with...
Levin Management
Levin ManagementScope of Work: Metal Framing and Sheathing, Installation of Doors, Windows and Hardware, Wall Framing, Shaft Walls, Gypsum Drywall Installation and Finishing, Acoustical Ceilings Location: 1501 Broadway Size: $1,000,000 - $2,000,000 Year: 2018...
One Wall Street
One Wall StreetScope of Work: Plastering of walls and ceilings, Shaftwalls, Soffits, Sheetrock ceilings with 1" specific pattern, 2 hour Rated Partitions, No Acoustical Ceiling Tiles, Elevator Fronts, Aligning Metal Beads, Mailbox Cavities, Installation of Hollow...



